1-1hit |
In this paper, we propose a polynomial time algorithm for computing the expected maximum number of vertex-disjoint s-t paths in a probabilistic basically series-parallel directed graph and a probabilistic series-parallel undirected graph with distinguished source s and sink t(st), where each edge has a mutually independent failure probability and each vertex is assumed to be failure-free.